AGN Gotthardtunnel Los 252 Amsteg – SWITZERLAND

Plant engineering: Concrete

At 57 km, the Gotthard Base Tunnel is the longest railway tunnel in the world. Keckeis Systems planned, manufactured and installed the plant technology for concrete processing for the ‘Amsteg’ section, which consists of two parallel single-track tubes, each 11.4 km long.

Customer
AGN Strabag AG & Mobil Baustoffe GmbH

Our scope of services:

Mixing plant

  • project planning
  • electrical engineering

Conveyor system

  • project planning and electrical engineering

Concrete loading

  • process engineering
  • project planning
  • electrical engineering
  • control system for fully automatic concrete loading into concrete trains for supplying the tunnel boring machines

Residual water treatment

  • process engineering
  • project planning
  • electrical engineering
  • control system

for:

  • Treatment of tunnel sludge
  • Treatment of wash water from concrete trucks and the mixing plant
  • Treatment of residual concrete

In this plant, all wash water was returned to the cleaning cycle and the press cake was disposed of.