Wopfing Lime Works – AUSTRIA

Plant engineering: Dry plaster

This plant was constructed around 30 years ago using fibre optic technology. Three production lines with raw material processing, mixing technology, bulk loading + finished goods bagging (1800 units/hour).

Customer
Wopfinger Baustoffindustrie GmbH

Project
This plant was built around 30 years ago using fibre optic technology (FO technology).

Three production lines with raw material processing, mixing technology, bulk loading + finished goods bagging (1800 units/hour).

Our scope of services: ;

Electrical engineering

  • 40 m of power components
  • 550 electric drives
  • 1200 solenoid valves
  • 2500 limit switches