Customer
BSL Brech- und Siebwerke Lorüns GmbH & Co KG
Project
The plant was founded in 1998 by Transbeton to secure the raw material resource ‘limestone’ in Lorüns for the future.
Our scope of services:
Gravel plant
- complete renovation of the entire gravel plant
- re-engineering of the electrical, control and safety technology
- optimisation of process engineering in cooperation with the customer
- energy-efficient operation with state-of-the-art electrical engineering
Truck loading
- project planning
- electrical engineering




