AGN Gotthardtunnel Los 151 Erstfeld – SWITZERLAND

Plant engineering: Concrete

The Erstfeld section consists of two parallel single-track tunnels, each 7.4 km long. The total length of the Gotthard Base Tunnel is 57 km.

Customer
AGN Strabag AG

Our scope of services:

Concrete loading

  • process engineering
  • project planning
  • electrical engineering
  • control system

for fully automatic concrete loading into concrete trains to supply the tunnel boring machine.

After our highly successful work on the ‘Amsteg’ section, our customer commissioned us as the general contractor for the subsequent ‘Erstfeld’ section. We were given full responsibility for supplying the moving factory (tunnel boring machine) with concrete just in time using our highly efficient high-tech solution.

Are you interested in a project or do you have any questions?

Please do not hesitate to contact us.
We will be happy to advise you.

Contact us