Systems engineering
AGN Gotthardtunnel Los 252 Amsteg – SWITZERLAND
Client
AGN Strabag AG & Mobil Baustoffe GmbH
Project
The section “Amsteg“ consists of two parallel tunnels each 11.4 km long. The total length of the Gotthard-Basistunnel is 57 km.
Our scope of work:
Batching plant
- Project development
- Electrical installation
Conveyor system
- Project development and electrical installation
Concrete loading
- Process engineering
- Project development
- Electrical installation
- Control system for fully automated concrete loading to the railway wagons to supply the tunnel boring machine (TBM)
Residual water treatmentg
- Process engineering
- Project development
- Electrical installation
- Control system
for:
- Processing of tunneling sludge
- Processing of cleaning water
- Processing of returned concrete
At this project the entire cleaning water was returned to the cleaning process.